Clevizio
← All articles
Blog · Costs & performance

EUDR: a food manufacturer's deforestation checklist

Cocoa, coffee, soy, palm oil, wood, rubber, cattle: the EUDR regulation against deforestation applies at the end of 2026. What a food manufacturer must check, point by point, before its materials get blocked.

Mansour NiangBy Mansour Niang, CEO & co-founder, Clevizio·Published September 16, 2026·6 min read

Key takeaway

The first step is to cross-check your purchases against the seven commodities covered by the EUDR deforestation regulation: cattle, cocoa, coffee, oil palm, rubber, soy and wood, plus their derivatives listed by customs code in the annex. The output is a list of the references concerned, which sizes everything else.

Check whether your materials fall within the scope of the EUDR regulation

The first item on the list is to cross-check your purchases against the seven commodities targeted by the EUDR regulation against deforestation: cattle, cocoa, coffee, oil palm, rubber, soy and wood, as well as the products derived from them, listed by customs code in the annex to the text. A food manufacturer finds far more there than its obvious raw materials: chocolate and cocoa powder, roasted coffee, palm oils and derivatives used in recipes. Add soy lecithin and meal in animal feed, leather, cardboard and papers from wood, certain rubber tires and seals. Packaging used solely to protect or transport another product is in principle out of scope, unlike packaging sold as such, and this nuance is worth checking reference by reference with the nomenclature codes. The Commission proposed targeted adjustments to the product scope in spring 2026, so you must work from the latest version of the annex and not from a 2023 list. The output of this first item is a list of the references concerned, with their annual volume and their supplier, and it is that list that sizes everything else.

Know the date that applies to you

The regulation was postponed twice, and the version in force, resulting from the amendment adopted in December 2025, sets the application at December 30, 2026 for large and medium enterprises, and at June 30, 2027 for micro and small enterprises outside the wood sector. The Commission published in May 2026 the simplification review it had been asked for, and it confirmed the December 2026 date with no new postponement, while easing certain procedures. I note these dates as I write, recommending that you check the version in force, because this text has shown it can move a few weeks before the deadline. For a food mid-market company, this means that any material concerned received after December 30, 2026 must be covered by due diligence, which forces you to look at the orders already placed for January 2027 delivery. The date the supply chain must keep in mind is that of the last uncovered order, which falls several months before the application date.

Know who must file the due diligence statement

The third item is to determine your role in the chain, because the obligations depend on it. Since the December 2025 amendment, the due diligence statement falls to the operator who places the product on the Union market for the first time, the importer of cocoa beans or the trader who brings them in. Operators downstream no longer have to file their own statement for each lot, but must keep the reference number of the upstream statement and guarantee documentary traceability. And this collection obligation applies only to the first downstream operator, not to the whole chain. A mid-market company that imports its material itself from the origin is therefore a first-tier operator, with the full burden of due diligence. A mid-market company that buys from a European trader is downstream, with a lighter but real burden: obtaining the reference numbers, attaching them to its lots, keeping them available to the authorities. This checklist item translates into one line per supplier concerned: who I buy from, where it places the product on the market, and who carries the statement.

Obtain the geolocation of the plots

This is the requirement that makes the regulation distinctive and that costs the most. Each lot of the material concerned must be tied to the plots where it was produced, by a point for small plots and by a polygon beyond four hectares, with the production period. This geolocation must make it possible to verify that there was no deforestation after December 31, 2020. For cocoa bought from cooperatives of several thousand growers, this assumes the supplier has collected the coordinates of each holding and knows how to say which holdings fed which lot. In practice this rules out untraced blends, and imposes a physical separation or a lot-level traceability finer than most commodity chains knew how to do. The system of rating countries by risk level, low, standard or high, lightens due diligence for origins classified low-risk, without removing the geolocation. This checklist item is resolved through a contractual clause with each supplier of the material concerned, providing for the delivery of coordinates by lot, and through a real test on a delivery before the deadline, because a signed clause does not prove that a file will arrive.

Organize lot traceability in your systems

The fifth item is internal: your systems must be able to tie a received lot to its statement or to its reference number, to track that lot through production to the finished product, and to render this chain to an authority that requests it. In most food mid-market company ERPs, lot traceability already exists for sanitary reasons. The challenge is to add a field to it, the reference number of the upstream statement, to make it mandatory on receipt for the materials concerned, and to block receipt when it is missing. The dedicated European information system, in which the statements are filed and where the numbers are generated, must be connected to this process, at least by a manual procedure at the start. This item also requires training the receiving and procurement teams, because the first time a truck of coffee arrives without a reference number on a Friday evening, the decision will be made on the dock and not in a compliance meeting.

Decide what to do when a supplier does not provide the data

The last item on the checklist is the one the regulation cannot write for you. The text says that a material not covered by due diligence cannot be placed on the market. It does not say what to do with a ten-year supplier who delivers a quality cocoa, holds its prices, and still does not have the coordinates of half its growers three months before the deadline. Replacing it means an alternative origin, a requalification at the plant, an impact on taste and on cost; waiting for it means a buffer stock whose size and financing you have to decide. Helping it means paying for part of the collection at a supplier that also sells to your competitors. None of these options is written in the regulation, and each one costs in euros of margin and in stockout risk, on a horizon of a few weeks. The regulation requires you to know where each lot comes from, it says nothing about the decision when the chain cannot answer. And it is that decision, made fast, costed, and kept in memory for the next campaign, that will separate the manufacturers who clear the deadline from those who see their material blocked in customs.

In short

EUDR: a food manufacturer's deforestation checklist

  • Check whether your materials fall within the scope of the EUDR regulation
  • Know the date that applies to you
  • Know who must file the due diligence statement
  • Obtain the geolocation of the plots
  • Organize lot traceability in your systems
  • Decide what to do when a supplier does not provide the data

Clevizio

Clevizio is the decision layer that plugs into your existing tools: it detects disruptions, simulates your options and keeps a record of every trade-off. See how the decision copilot works.

Mansour Niang

Mansour Niang

CEO & co-founder, Clevizio

A question about your disruptions? Book 30 minutes with me to estimate what they really cost you, with no commitment.

Frequently asked questions

Which products are covered by the EUDR regulation?

Seven commodities and their derivatives: cattle, cocoa, coffee, oil palm, rubber, soy and wood. For a food manufacturer, this covers chocolate, roasted coffee, palm oils and derivatives, soy lecithin and meal, leather, papers and cardboard. The exact list is read by customs code in the annex to the regulation, for which the Commission proposed adjustments in 2026.

When does the EUDR regulation take effect?

December 30, 2026 for large and medium enterprises, and June 30, 2027 for micro and small enterprises. These dates come from the amendment adopted in December 2025 and confirmed by the Commission in May 2026. The text has already been postponed twice, so it remains prudent to check the version in force before the deadline.

What is EUDR due diligence?

It is the procedure by which the operator placing a material concerned on the European market documents its origin and assesses its risk. It collects information on the origin, including the geolocation of the plots, assesses the risk of deforestation and illegality, mitigates it if needed, then files a statement in the European system. Downstream operators keep the reference number of that statement and ensure the documentary traceability of their lots.

Finally put a number on what disruptions cost you every year.

Let's start by estimating what your disruptions really cost you. It's free, it takes 30 minutes, and you leave with a figure nobody in your company knows today.