Clevizio
← All articles
Blog · Costs & performance

Target costing: method and worked example

Target cost modeling starts from the price the market will accept to deduce what each purchased part is allowed to cost. Method, should-cost and a worked numeric example.

Mansour NiangBy Mansour Niang, CEO & co-founder, Clevizio·Published October 25, 2026·7 min read

Key takeaway

The target cost, or target costing, is the maximum allowable cost of a product, calculated as the targeted selling price minus the targeted margin. Target cost modeling breaks it down by component, then compares it against the should-cost, the theoretical cost rebuilt line by line. The gap between supplier price, should-cost and target cost structures the negotiation.

What is the target cost?

The target cost is the maximum cost a product can reach while still delivering the targeted margin at the price the market will accept, and its formula fits on one line: target cost equals targeted selling price minus targeted margin. The method, formalized by Japanese industry and popularized under the name target costing, reverses the usual logic of price calculation. Instead of adding up the costs then adding a margin in the hope that the customer follows, you start from the ceiling price, remove the required margin, and obtain the envelope within which design, production and purchasing must fit. This envelope is then broken down by function and by component, which gives each purchased part its own target cost. For an industrial buyer, it is a change of stance: they no longer negotiate only against last year's price, they negotiate against a figure that flows from the profitability of the finished product. The method applies above all during development, when the design of the part and the choice of materials are still open, because a large share of the final cost is locked in at the design stage.

Target cost and should-cost: what is the difference?

The target cost comes down from the market, the should-cost comes up from manufacturing, and the negotiation plays out in the gap between the two. The target cost answers the question of what the part is allowed to cost given the selling price and the margin. The should-cost answers a different question: how much the part should cost if an efficient supplier made it with realistic assumptions of material, time, hourly rate and margin. The two figures almost never coincide. If the should-cost is below the target cost, the target is reachable and the supplier price, if it exceeds it, contains a documented negotiation margin. If the should-cost exceeds the target cost, no negotiation will be enough: you have to rethink the design, the material, the tolerance or the process, and the subject goes back to engineering. This distinction avoids two symmetrical mistakes, pressing a supplier on a price that physically cannot come down, or accepting an inflated price for lack of knowing what the part should cost. Target cost modeling therefore always uses both, the target to set the objective, the should-cost to know the path to reach it.

How do you build a should-cost, line by line?

A should-cost is built in six items, in this order. Material first: gross weight of the part, including scrap and rejects, multiplied by the price of the material, read from a reference index or quotation rather than from the price announced by the supplier. Transformation next, process by process, by multiplying the cycle time by a realistic machine and labor hourly rate for the production area. Subcontracted operations, surface or heat treatment, are priced separately, often as a lump sum. The supplier's overhead is added as a percentage of transformation. Logistics, packaging and transport to your site, comes next. The supplier's margin closes the calculation, at a rate consistent with its sector. The assumptions matter more than the precision of the calculations: a cycle time overestimated by thirty seconds distorts the result more than a cent error on the material. You therefore have to document each assumption, its source and its variation range, so the model can be discussed line by line with the supplier, and not brandished as a verdict.

Worked example: the should-cost of an aluminum housing

Take a fictional example to fix ideas: a cast then machined aluminum housing, bought today at 17.20 euros a piece, for which the finished product imposes a target cost of 15.00 euros. The part weighs 1.2 kilos of material, with 6% loss, and the assumption uses an alloy at 2.60 euros a kilo. The foundry takes 90 seconds at 120 euros an hour, the machining 4 minutes at 75 euros an hour, and the surface treatment is subcontracted as a lump sum. The table details the calculation. The should-cost comes out at 14.58 euros, below the target cost, which means the target is reachable without touching the design. The gap with the current price reaches 2.62 euros, about 15% of the price paid, and it is that gap you have to explain with the supplier. The breakdown also shows where to look: machining weighs more than a third of the cost, and reducing the foundry oversize to save one minute of machining would be worth 1.25 euros per part, more than a negotiation effort on the margin.

ItemAssumption (example)Euros per pieceShare of total
Material1.2 kg at 2.60 euros a kilo, 6% loss3.3122.7%
Foundry90 seconds at 120 euros an hour3.0020.6%
Machining4 minutes at 75 euros an hour5.0034.3%
Surface treatmentSubcontracted lump sum0.704.8%
Overhead12% of transformation1.047.1%
Packaging and transportLump sum per piece0.453.1%
Supplier margin8% of the cost of goods1.087.4%
Should-costTotal14.58100%

Using the should-cost in negotiation

The should-cost serves to open a negotiation on the facts, provided you present it as an assumption to be corrected and not as an imposed price. The approach that works consists of sharing the structure of the calculation with the supplier, line by line, and asking them where they diverge. The answers are instructive. A longer cycle time reveals an old machine or a poorly set process. A higher reject rate signals a quality problem the buyer can help address, and a margin well above the sector indicates a position of strength to be contested through competition. In the housing example, the 2.62 euro gap rarely falls on a single item, and it is the line-by-line discussion that recovers part of the gap without breaking the relationship. The should-cost also prepares indexation clauses: once the material share is isolated, here 3.31 euros, you can index that share alone on a public index, which protects both parties. The supplier who accepts the exercise often gives more than you hoped, because they prefer a technical discussion to a flat demand for a cut.

The pitfalls of target cost modeling

Target cost modeling rarely fails on the calculation and often on how it is used. The first pitfall is the target set without engineering, which turns a design objective into mere pressure on purchasing, when most of the gains lie in the design of the part. The second is the should-cost built on hourly rates from another geographic area, which produces an unrealistic figure the supplier dismantles in ten minutes and which discredits the whole effort. The third is forgetting the costs the unit price does not show: amortized tooling, minimum batches, transport conditions, safety stock imposed by a long lead time. The fourth is one-sided use, when the buyer keeps the model to themselves and presents only the desired price, which brings the discussion back to the balance of power you wanted to avoid. The last is the frozen model, computed at product launch and never updated, when material, energy and volumes change every quarter. A useful cost model lives with the product.

The target cost moves with the material: deciding when the gap widens

A target cost computed once and for all ages fast, because the material and energy that make it up move during the life of the product. In the example, a 10% rise in the alloy adds about 0.33 euro to the should-cost, which rises to 14.91 euros, still below the target; a 25% rise takes it to 15.41 euros, above it. No buyer can predict which of these two scenarios will occur, and it would be pointless to build the strategy on forecasting the price. What matters is knowing in advance from what material level the target breaks, and what decision you will take that day. The options are known: renegotiate the selling price, accept a reduced margin for a period, launch the design change already studied, or qualify a second source. The cost model then becomes a living decision tool, linked to prices, that signals the crossing of the threshold and prices each option in euros of margin. The companies that react fast to these moves protect their margin better than those that computed the most precise target, and that responsiveness is prepared before the rise.

In short

Target costing: method and worked example

  • What is the target cost?
  • Target cost and should-cost: what is the difference?
  • How do you build a should-cost, line by line?
  • Worked example: the should-cost of an aluminum housing
  • Using the should-cost in negotiation
  • The pitfalls of target cost modeling
  • The target cost moves with the material: deciding when the gap widens

Clevizio

Clevizio is the decision layer that plugs into your existing tools: it detects disruptions, simulates your options and keeps a record of every trade-off. See how the decision copilot works.

Mansour Niang

Mansour Niang

CEO & co-founder, Clevizio

A question about your disruptions? Book 30 minutes with me to estimate what they really cost you, with no commitment.

Frequently asked questions

How do you calculate a target cost?

The target cost is calculated by subtracting the targeted margin from the selling price the market will accept. It is then broken down by function and by component to give each purchased part its allowable cost.

What is should-cost in purchasing?

The should-cost is the theoretical cost of a part rebuilt item by item: material, transformation, subcontracting, overhead, logistics and supplier margin. It serves to check whether the price paid is justified.

What is the difference between target cost and cost of goods?

The target cost flows from the selling price and the targeted margin, the cost of goods records the actual cost. The first sets an objective, the second measures a result.

Finally put a number on what disruptions cost you every year.

Let's start by estimating what your disruptions really cost you. It's free, it takes 30 minutes, and you leave with a figure nobody in your company knows today.