Shrinkage rate: definition, formula and calculation
The shrinkage rate measures material lost in production or goods gone missing in distribution, and it skews your requirements if it is set wrong. Formula, a worked example and a method to reduce it.
Key takeaway
The shrinkage rate is the share of material or goods lost between the input and the output of a process, related to the quantity in. It is calculated as follows: (quantity in minus usable quantity out) divided by quantity in, multiplied by 100. In distribution, the term used is rather shrinkage.
What is the shrinkage rate?
The shrinkage rate is the proportion of material, product or goods lost during a process, between what goes in and what comes out usable. In industrial production, shrinkage covers cutting offcuts, machining chips, evaporation, drying, setup parts at the start of a run and handling losses. In food processing, it includes losses at cooking, trimming or packaging, which can be structural and predictable. In distribution and logistics, the word takes a neighboring sense, that of stock shrinkage: breakage, theft, picking errors, products expired or damaged in storage. The common point is the same: a quantity bought and paid for that never reaches the customer in sellable form. Normal shrinkage, inherent to the process, is distinct from accidental shrinkage, tied to a defect, an incident or an error, and these are two subjects that are not handled the same way.
How to calculate the shrinkage rate?
The shrinkage rate is calculated by dividing the quantity lost by the quantity in, then multiplying by 100: shrinkage rate equals quantity in minus usable quantity out, divided by quantity in, times 100. Its complement is the material yield, equal to the usable quantity out divided by the quantity in. Take a line that receives 1,000 kg of sheet metal: cutting leaves 920 kg usable, machining 870 kg, and after quality control 855 kg of conforming parts remain. The overall shrinkage rate reaches 145 divided by 1,000, that is 14.5%, and the material yield 85.5%. The calculation by step is more instructive: 8% at cutting, 5.4% at machining, 1.7% at control. Beware a common mistake, which is to add up the step rates: each rate applies to what remains after the previous step, so the overall yield is the product of the step yields and not the sum of the losses. You also have to fix the unit of measure, weight, volume or number of parts, and stick to it over time.
| Step | Quantity in | Usable quantity out | Shrinkage rate of the step |
|---|---|---|---|
| Cutting | 1,000 kg | 920 kg | 8.0% |
| Machining | 920 kg | 870 kg | 5.4% |
| Quality control | 870 kg | 855 kg | 1.7% |
| Whole process | 1,000 kg | 855 kg | 14.5% |
Shrinkage, scrap, stock shrinkage: what is the difference?
The three words overlap in part and deserve to be distinguished in the indicators. Shrinkage is a loss of quantity inherent to the process or to storage, often expected and built into the calculations, like the offcut of a cut or the moisture loss of a drying product. Scrap refers to a part or a batch made but non-conforming, that can neither be sold nor reworked, and that is first a quality matter. Stock shrinkage is the distribution and retail term for the gap between the theoretical stock and the real stock. Known shrinkage groups breakage and products withdrawn for expiry, unknown shrinkage the thefts and administrative errors found at the inventory count without being able to explain them. In a dashboard, mixing the three means adding up a normal process cost, a quality defect and a loss of stock control, three problems that have neither the same causes nor the same owners.
Why a wrong shrinkage coefficient throws off your requirements
In the ERP, shrinkage enters the bills of materials as a coefficient, and the requirements calculation uses it to turn a net requirement into a gross material requirement: gross requirement equals net requirement divided by one minus the shrinkage rate. Take a run of 10,000 parts with shrinkage set at 3%: the MRP plans 10,309 units of material. If the real shrinkage has slipped to 6% since a supplier change, 10,638 would be needed, and the run will be short 329 units of material at the end of production, when it is too late to replenish without an emergency. The opposite flaw costs too, since an overestimated coefficient inflates purchases, stock and the calculated cost of goods, and can skew a quote. Yet the shrinkage coefficient is one of the least reviewed parameters of the bills of materials, often entered at product launch and never reset against the measured reality. Comparing it each quarter with the observed shrinkage by family is a simple check that avoids many unexplained stockouts.
What a point of shrinkage costs
A point of shrinkage looks negligible in a dashboard, and it rarely is in the P&L. Take the run of 10,000 parts again and assume a material at 40 euros a unit. With 5% shrinkage, 10,526 units of material are needed, with 6% it takes 10,638, that is 112 units more, about 4,480 euros per run for a single point. On a family that runs twenty runs a year, the gap exceeds 89,000 euros, before even counting the machine time spent making parts that will end up as offcuts, the energy, the waste treatment and the transport. The calculation has a second benefit: it says where to put the effort, since a point gained on an expensive material is worth far more than a point gained on a cheap one. Ranking the steps and families by shrinkage cost in euros, rather than by rate, often shows that two or three items concentrate the largest part of the stake, and that the action plan can start with them.
How to reduce the shrinkage rate?
You reduce shrinkage by first measuring it where it is born, step by step and by product family, because an overall rate of 14% does not say where to act. Run start-up losses are often the first source, with setup parts that multiply when run changes are frequent, which ties shrinkage directly to the way production is sequenced. Then come machine setups and maintenance, the quality and regularity of the material received, which can be tracked by supplier, and the optimization of cutting plans. In distribution, you work on stock rotation and compliance with first in first out to limit expiry. You also have to train people to declare, because an undeclared shrinkage reappears later as an unexplained inventory gap. Finally, you distinguish what belongs to the process, which you improve through projects, from what belongs to the incident, which you handle by reaction: both weigh on the same indicator but do not call for the same resources.
When shrinkage drifts mid-run
The average shrinkage rate serves to plan, but it is its drifts that cost dearly, and they arrive without warning. A more heterogeneous batch of material, a worn tool, a new operator or unusual heat can take a step from 5% to 9% losses in a few days, and the plan calculated with the old coefficient becomes wrong while the run is going. No parameter setting, however careful, anticipates these gaps, and the useful question becomes that of detection time: do you learn of the drift at the end of the run, at the inventory count, or from the first batches declared. Fast detection opens options, topping up the material in time, adjusting the quantity launched, warning the customer of a partial delivery, whereas late detection leaves only the emergency and express transport. The companies that master their shrinkage are not the ones with the perfect coefficient in their ERP, they are the ones that see the gap early enough to decide calmly.
This article starts from a conviction: the perfect forecast doesn't exist, what matters is the decision that follows.
- What is the shrinkage rate?
- How to calculate the shrinkage rate?
- Shrinkage, scrap, stock shrinkage: what is the difference?
- Why a wrong shrinkage coefficient throws off your requirements
- What a point of shrinkage costs
- How to reduce the shrinkage rate?
- When shrinkage drifts mid-run
Clevizio
Clevizio is the decision layer that plugs into your existing tools: it detects disruptions, simulates your options and keeps a record of every trade-off. See how the decision copilot works.
Frequently asked questions
What is the difference between shrinkage and stock shrinkage?
Process shrinkage is a material loss tied to the process or to storage, stock shrinkage is a gap between theoretical and real stock in distribution. Stock shrinkage includes breakage, expiry, theft and administrative errors.
What is a normal shrinkage rate?
There is no universal normal shrinkage rate, because it depends on the process, the material and the product. The right benchmark is your own rate measured by step and by family, tracked over time.
How to build shrinkage into a bill of materials?
You enter a shrinkage coefficient per component or per operation, which the MRP applies to go from the net requirement to the gross requirement. The gross requirement equals the net requirement divided by one minus this rate. This coefficient must be reset regularly against the shrinkage actually measured.
How to calculate the material yield?
The material yield equals the usable quantity out divided by the quantity in, multiplied by 100. It is the complement of the shrinkage rate: 14.5% of shrinkage corresponds to 85.5% of yield.
Finally put a number on what disruptions cost you every year.