Production leveling and heijunka: method and limits
Production leveling spreads output in volume and in mix to remove the peaks and troughs on the shop floor, up to Toyota's heijunka. Methods, example and limits in the face of the unexpected.
Key takeaway
Production leveling spreads output evenly over time, in volume and in mix, to avoid the peaks that saturate the workshop and the troughs that leave it idle. Heijunka, from the Toyota production system, pushes the logic to producing a little of every SKU each day rather than in large batches.
Why level the production load?
Leveling the load serves to make the workshop work at a steady pace, because jolts cost more than the average suggests. A peak week is paid for in overtime, in less-trained temps, in emergency subcontracting and in degraded quality, then the trough week is paid for in hours paid without output. Jolts also propagate upstream: a workshop that consumes its components in waves sends its suppliers a sawtooth demand, which they amplify in turn by protecting themselves with stock. This is the mechanism well known as the bullwhip effect in the supply chain. Finally, steady output makes problems visible, since a drift is noticed at once in a stable flow whereas it drowns in an agitated one. Leveling does not reduce total demand, it changes the way the plant receives it, and that is what allows teams, stocks and supplies to be sized on an average load rather than on the worst day.
Leveling by volume and leveling by mix
Leveling by volume spreads the total quantity to produce evenly across the periods: if the month calls for 4,000 pieces over twenty days, the workshop makes 200 a day, whatever the profile of the orders. You achieve it by absorbing demand variations with a finished-goods stock or with a delivery lead time, which means accepting one or the other. Leveling by mix goes further: it also spreads the SKUs, so that each day, or even each hour, resembles the previous one in composition. This is the heart of heijunka, a Japanese word translated as leveling, a pillar of the Toyota production system. Instead of producing SKU A on Monday and Tuesday then B on Wednesday, the line produces a little A, B and C each day, following a repeated sequence. The example below compares the two logics for a weekly demand of 500 pieces of A, 300 of B and 200 of C: in batch production, the customer for C waits until Friday, in leveled production they are served every day.
| Day | Batch production | Leveled production (heijunka) | Availability of C |
|---|---|---|---|
| Monday | 200 A | 100 A, 60 B, 40 C | batches: none, leveled: 40 |
| Tuesday | 200 A | 100 A, 60 B, 40 C | batches: none, leveled: 80 |
| Wednesday | 100 A, 100 B | 100 A, 60 B, 40 C | batches: none, leveled: 120 |
| Thursday | 200 B | 100 A, 60 B, 40 C | batches: none, leveled: 160 |
| Friday | 200 C | 100 A, 60 B, 40 C | batches: 200, leveled: 200 |
How to calculate the takt time and the leveled sequence?
The takt time is calculated by dividing the available production time by demand over the same period, and it gives the pace at which a piece must come off the line. Take a line running two shifts of 7.5 net hours, that is 900 minutes a day, and an average demand of 200 pieces a day: the takt time is 4.5 minutes. If the cycle time of the slowest station exceeds 4.5 minutes, the line cannot keep up, and leveling then starts with a capacity problem. For the mix, you start from the proportions of demand, here 100 A, 60 B and 40 C a day, that is a ratio of 5 to 3 to 2. The smallest sequence that respects this ratio counts 10 pieces, for example A B A C A B A B A C, repeated twenty times over the day. The sequence is built to space out each SKU as well as possible, so that the upstream stations and the suppliers see a steady consumption of each component. In practice, changeovers often impose a coarser sequence, in small batches of A, B and C repeated several times a day, which keeps most of the benefit. The takt time must finally be recalculated when average demand changes durably, on pain of leveling on a pace that no longer matches the market.
The methods for leveling the load
The first tool is the plan itself: at the master plan level, you set a production pace per family over the firm horizon, often aligned with the takt time, the available time divided by average demand. The second is the heijunka box, a physical or digital board with slots where you drop the kanban cards following the sequence, each column corresponding to a fixed time interval, which makes the gap to the pace visible at any moment. The third is reducing changeover times, a precondition for leveling by mix: as long as a changeover takes two hours, producing every SKU every day costs too much, and the SMED method makes the small batch economical. The fourth is sizing a finished-goods buffer stock, which separates the steady pace of the workshop from the irregular pace of orders. The fifth is commercial: negotiating steadier delivery calls with large customers, which often pays more than all the shop-floor efforts.
What leveling requires, and what it costs
Leveling rests on a trade-off that is better stated clearly in the executive committee. Producing at a constant pace against variable demand forces you to build stock when demand is low and draw it down when demand is high, therefore to carry a finished-goods stock whose carrying cost is real. It also forces you to freeze part of the plan over the short horizon: if every rush order can enter the day's sequence, leveling disappears within a week. It finally assumes a demand whose average profile is stable enough for a pace to make sense, which suits repetitive medium and large-series production well, much less make-to-order workshops where every order is different. For the latter, leveling is practiced on load per station, spreading the hours over the coming weeks, rather than on the product mix. In every case, the decision to level is a decision about stock and lead time as much as about workshop organization.
When leveling breaks in the face of the unexpected
Leveling works as long as variations stay within the range for which it was sized, and it is precisely when they go outside it that the workshop needs it most. A long breakdown on the line, a supplier delivering half the components of B, a customer tripling an order for the following week: the pace no longer holds, the buffer stock empties on one side and swells on the other. The temptation is then to abandon the sequence and go back to large batches to catch up, which recreates exactly the jolts that had been removed and disrupts the suppliers for several weeks. The useful rule is to write in advance what allows you to step out of leveling: what stock threshold, what level of customer urgency, what breakdown duration, and who decides. Without that rule, every unexpected event becomes a negotiation between the workshop, sales and logistics, and the sequence loses a little of its credibility each time.
Level the plan, prepare the reaction
No leveling rests on a perfect forecast, and the frequent mistake is to believe that a better demand model would be enough to hold the pace. The pace is sized on an average demand, and actual demand will always deviate from it, sometimes sharply, which no calculation removes. The question to prepare is therefore that of reaction, when demand or capacity goes outside the expected range. You need to know how much each option costs, between drawing from stock, adding a shift, pushing back a customer or breaking the sequence for a few days, and which one best protects the margin and the commitments made. A leveled plant that can arbitrate fast keeps most of the benefits of leveling, even in the bad weeks. A leveled plant that discovers the unexpected at the morning huddle and treats it by reflex loses in a few days the regularity built over several months. Leveling organizes the normal case, the quality of the decision protects against the case that is not.
This article starts from a conviction: the perfect forecast doesn't exist, what matters is the decision that follows.
- Why level the production load?
- Leveling by volume and leveling by mix
- How to calculate the takt time and the leveled sequence?
- The methods for leveling the load
- What leveling requires, and what it costs
- When leveling breaks in the face of the unexpected
- Level the plan, prepare the reaction
Clevizio
Clevizio is the decision layer that plugs into your existing tools: it detects disruptions, simulates your options and keeps a record of every trade-off. See how the decision copilot works.
Frequently asked questions
What is production load leveling?
Load leveling spreads output evenly over time to avoid peaks and troughs of activity. It is practiced by volume, equal quantity per period, and by mix, the same composition of SKUs every day.
What is heijunka?
Heijunka is the leveling of production in volume and in mix, a pillar of the Toyota production system. Instead of successive large batches, the line produces a little of every SKU each day following a repeated sequence.
What is the difference between leveling and smoothing of production?
The two terms are often synonyms; smoothing, or heijunka, is sometimes reserved for leveling by mix. Leveling by volume equalizes the quantities, smoothing also equalizes the composition of the SKUs produced.
Finally put a number on what disruptions cost you every year.