DRP: planning multi-site distribution
DRP plans replenishments between warehouses and points of sale: principle, a two-level calculation example and the difference with MRP. And what it does not do when the network deviates from the plan.
Key takeaway
DRP (Distribution Requirements Planning) is the method that calculates what to ship, to which site and when, in a network with several levels of stock. It compares each site's demand to its stock, deduces a net requirement and offsets it by the transport lead time. MRP plans production, DRP plans distribution.
What is DRP in logistics?
DRP, for Distribution Requirements Planning, is the method that calculates what to ship, to which site and when, in a network with several levels of stock. It plans replenishments across that network: central warehouses, regional depots, points of sale. Where MRP calculates the requirements to produce, DRP calculates the requirements to distribute and position stock in the right place. It answers a precise question: how much to send, to which site, and when, to serve local demand without overloading the network. It is the tool of companies that manage several storage points, and most ERP and APS systems offer a more or less complete version of it.
How does DRP work?
DRP starts from each site's demand, consolidates it by rolling up the network, and triggers replenishments while accounting for local stock, transport lead times and shipping quantities. At each period, it compares each site's forecast demand to its available stock and its expected receipts, deduces a net requirement, then offsets that requirement in time according to the transport lead time, to set the date at which the shipment must leave the upstream. The quantities are then adjusted to the logistics constraints, minimum shipments, pallet multiples or full trucks. The whole thing recalculates on a rolling horizon, at each update of sales and stock, so that the distribution plan stays glued to the reality of the network. The calculation cascades from the point of sale up to the central warehouse.
| Step | What is calculated |
|---|---|
| Local demand | Needs of each downstream site |
| Available stock | What each site already has |
| Net requirement | What needs replenishing |
| Consolidation | Needs rolled up to the upstream |
| Transfer orders | What to ship, where to, when |
A two-level DRP calculation example
Take an illustrative example, simplified for readability. A regional depot sells 50 units a week of an item, holds 120 units in stock, wants to keep 40 safety units and is delivered by the central warehouse within a one-week lead time. In week 1, the projected end-of-period stock falls to 70, which stays above the safety threshold, so no requirement appears. In week 2, it would fall to 20, below the 40 safety units: DRP calculates a net requirement of 20 units, rounded to the shipping multiple, say a pallet of 60. Because transport takes a week, the shipment must leave the central warehouse in week 1. The same reasoning runs for each depot in the network, and the central warehouse adds up these planned shipments to know its own demand. It is this consolidation that, in turn, feeds its own replenishment from the plant or the supplier. With ten depots and two thousand items, the calculation becomes impossible by hand, but the logic stays the one in this example.
What is the difference between DRP and MRP?
MRP and DRP resemble each other in their mechanics (gross requirements, stock, net requirements, offset by lead times), but they apply to different worlds. MRP plans manufacturing upstream, DRP plans distribution downstream. In an integrated company, the two complement each other: DRP consolidates the needs of the points of sale and feeds the plant's MRP, which triggers production. Together, they link field demand to production, through the logistics network. In practice, the boundary sits at the plant warehouse: everything downstream, depots and stores, falls under DRP; everything upstream, components and materials, falls under MRP. A company that distributes without manufacturing uses only DRP, with the supplier at the end of the chain in place of the plant.
The parameters that make a good DRP
The result of a DRP depends on a few parameters, and that is where the quality of the plan is decided. Safety stock per site, first, which should reflect local demand variability rather than a uniform percentage applied to the whole network. Transport lead time, next, which includes the preparation time upstream and the put-away time downstream, not only the truck's journey. Shipping lot size, which trades off between transport cost and the stock tied up in the depots: a full pallet costs less to ship but sleeps longer. Review frequency, finally, weekly in most networks, daily when demand moves fast. Add to that the priority rules between sites, which decide who is served first when the central warehouse cannot honor every need. Reviewing these parameters every quarter, family by family, keeps a DRP set two years ago from continuing to distribute the stock of a network that has changed since.
When DRP becomes useful
DRP comes into its own as soon as a network counts several storage sites to arbitrate: multi-depot distribution, store networks, international subsidiaries. Without it, each site orders in its corner, which creates overstock here and stockouts there, and amplifies the bullwhip effect in the chain. With it, you steer the network as a whole, pool the stock and smooth transport. The wider and more volatile the network, the clearer the gain. One telltale sign: when transfers between depots, those unplanned shipments that move stock from a surplus site to a site in stockout, become a weekly routine, it means the network is steered site by site and a DRP is missing. Conversely, a company with a single warehouse does not need one: a reorder point or a well-tuned MRP is enough, and DRP would only add a layer of complexity with no return.
The conditions for a DRP to keep its promises
A DRP is only worth as much as what you feed it. It needs reliable stock figures site by site, realistic local forecasts and transport lead times kept up to date, failing which it will very precisely allocate the wrong quantities. Also provide clear allocation rules for shortage periods, when the upstream cannot serve everyone: deciding these priorities calmly, before the strain, is always better than improvising them mid-crisis. Finally, make sure the sites play along, because a single depot ordering directly, outside the calculation, is enough to upset the stock of the whole network.
When the network deviates from the plan: the next decision
A DRP produces a coherent distribution plan from the forecasts of the moment. Those forecasts get it wrong, on one site or on ten, and nobody can do much about it: a local forecast lands right eight times out of ten in the best case. The real subject then becomes the week when one depot blows past its sales while another goes quiet. Should you transfer stock between depots, with unplanned transport, or leave the first in stockout for a few days? Should you serve the depot that feeds the most profitable customer, or the one shouting loudest? The DRP will recompute the plan at the next iteration, but it will not put a number in euros on these options, and it will not remember why you decided as you did last time. This decision layer, fast and costed, remains to be built on top of the calculation, and it is what separates the networks that absorb the unexpected from those that endure it.
This article starts from a conviction: the perfect forecast doesn't exist, what matters is the decision that follows.
- What is DRP in logistics?
- How does DRP work?
- A two-level DRP calculation example
- What is the difference between DRP and MRP?
- The parameters that make a good DRP
- When DRP becomes useful
- The conditions for a DRP to keep its promises
- When the network deviates from the plan: the next decision
Clevizio
Clevizio is the decision layer that plugs into your existing tools: it detects disruptions, simulates your options and keeps a record of every trade-off. See how the decision copilot works.
Frequently asked questions
What is DRP in logistics?
DRP is the method that plans replenishments between the sites of a distribution network, by calculating what to ship, where and when. It starts from each point of sale or depot's demand, consolidates it toward the central warehouse and sets the shipping dates according to transport lead times.
What is the difference between MRP and DRP?
MRP plans production, DRP plans distribution to the sites of the network. MRP acts upstream, from bills of materials and components; DRP acts downstream, from local demand, and the two complement each other in an integrated company.
When do you need a DRP?
As soon as you manage several storage sites: multi-depot, store networks, subsidiaries. DRP keeps each site from ordering in isolation, which creates overstock on one side and stockouts on the other, and amplifies the bullwhip effect.
Finally put a number on what disruptions cost you every year.
Let's start by estimating what your disruptions really cost you. It's free, it takes 30 minutes, and you leave with a figure nobody in your company knows today.